Bathroom installation, handled end to end
Old bathroom out, new bathroom in, cleaned and finished — without you having to chase separate trades. We design and supply your bathroom and coordinate the full installation through our trusted local fitters.
In short
- ✓A complete installation covers electrics, plumbing, removal of the old bathroom and a thorough clean before handover.
- ✓Designed and supplied by us; fitted by vetted, insured local installers we coordinate on your behalf.
- ✓Most installations take 7–14 working days; wet rooms or structural changes run 2–3 weeks, with a written start and finish date agreed up front.
- ✓One fixed, itemised quote — no day-rate surprises.
Book your free design visit
No obligation. Leave your details and we’ll arrange a showroom or home visit to plan your new bathroom — fixed price, no surprises.
What does a complete bathroom installation include?
A Bright Bathrooms installation covers the design consultation and every fixture, fitting and finish, plus the fitting itself: electrics, plumbing, removing the old bathroom, and a thorough clean before handover. We coordinate the design and supply, and our trusted local installers carry out the work, so you deal with one team from start to finish.
How much does bathroom installation cost in Greater Manchester?
Most full bathroom installations in Greater Manchester range from £8,000 to £20,000 depending on size, specification and how much plumbing or structural work is needed; supply-only offers start from around £4,000. Your price is fixed and itemised in writing after a free consultation, with no hidden costs.
How long does a bathroom installation take?
A standard installation takes 7–14 working days from strip-out to final clean. Wet rooms, larger renovations or jobs needing structural changes typically run two to three weeks. We agree a written start and finish date before work begins rather than juggling several projects at once.
What's included in your installation
Each project covers design and all the fixtures, fittings and finishes, plus the full fit: electrics, plumbing, removal and disposal of the old bathroom, and a proper clean before handover. The exact specification is itemised in your written quote so you can see precisely what you are getting.
The standards we work to behind the tiles
A bathroom lasts or fails on the parts you never see. We expect proper waterproofing in wet areas, tiles bedded on full adhesive coverage rather than dabs, and waste pipes laid to the correct fall — the details that prevent leaks, loose tiles and damp further down the line. These are the standards we hold the installers we work with to.
One team to deal with
You should not have to project-manage your own bathroom. We coordinate the design and supply side and support you through to completion, working with trusted plumbers, electricians and decorators from our local network — so there is no supply-versus-fitter blame game and no gaps between trades.
How it works
- 1
Book your free design visit
A no-pressure 30–60 minute visit at our showroom or your home.
- 2
Tell us about your space
We measure up, discuss your needs and understand how you want the room to work.
- 3
Explore styles & offers
See and feel the fixtures and finishes in the showroom before anything is ordered.
- 4
Get your fixed quote
A clear, itemised written quote with a start and finish date agreed up front.
- 5
Move into installation
Our trusted local installers fit the bathroom from plumbing to final polish, and we support you throughout.
Where most bathroom installations go wrong
The failures we see on other people’s installations almost always trace back to skipped fundamentals: tiling straight onto untreated plasterboard in a shower, dabs of adhesive behind heavy tiles, or a waste run with no fall. None of it shows on handover day — it shows up months later as damp, movement and loose tiles. Getting those basics right first time is exactly what we insist on.
Frequently asked
How long does a bathroom installation take?+
A standard bathroom installation takes 7-14 working days from strip-out to final clean. Larger renovations, wet rooms or structural changes can run 2-3 weeks. We give you a written start and finish date upfront and stick to it.
Do I need to organise plumbers and electricians myself?+
No — we connect you with trusted installation professionals from our local network, including plumbers, electricians and decorators. We coordinate the design and supply side and support you through to completion.
Do you offer a warranty or guarantee?+
The fixtures and finishes we supply are covered by their manufacturer warranties, and our trusted installation partners stand behind their workmanship. If anything isn't right after handover, get in touch and we'll help put it right.
